Wind task force · Reinforcement crews
A complete crew working on your site within days, not months
GWO-trained technicians with a team leader, vehicles, calibrated tooling and full PPE, integrated into your procedures, your HSE plan and your contractor coordination. For OEMs, EPC contractors and asset owners who need to close a punch-list, cabling, retrofit, lifeline or vertical-cleaning campaign on schedule. Greenwork Technology was founded in 2015; its team has worked on more than 50 wind farms and factories in 13 countries.
Who it is for
When qualified hands are short and the deadline will not move
A task force does not replace your organisation: it reinforces it. We work inside the OEM's, the EPC contractor's or the owner's structure, to their planning and their reporting, and we leave when the campaign is closed.
Turbine manufacturers (OEM)
Reinforcement during construction and warranty: punch-list and turbine-handover campaigns, cabling, fleet-wide retrofits, installation completion, lifeline and service-lift certification, preservation of idle turbines and prototype follow-up.
EPC contractors and constructors
Crews to reach the milestone: mechanical and electrical completion after erection, turbine cabling, service-lift installation and certification, lifelines and anchor points, vertical cleaning of tower sections and towers before acceptance.
Owners, IPPs and utilities
When the maintenance provider cannot keep up or the campaign is running late: preventive service, torque checks, generator alignment, retrofits, vertical cleaning, blade repair and an end-of-warranty task force to document defects before the warranty closes.
What is included
They arrive equipped and start work on day one
A Greenwork task force is not a list of technicians: it is a closed crew with its own lead, its own means and its own documentation, ready to take your site induction and go up the turbine.
- Team leader as single point of contact for your site or wind farm manager: daily planning, work report and document control.
- GWO-trained technicians with experience on the site's platform; electrical technicians and qualified rope-access technicians where the scope requires them.
- Vehicles and calibrated tooling with certificates: torque wrenches, generator alignment kits, measuring equipment and the campaign's consumables.
- Full PPE and inspected descent and rescue kits, with a rescue plan adapted to the turbine.
- HSE and contractor-coordination documentation in place before mobilisation: training, medical fitness, PPE, tooling certificates and insurance.
- Integration into your procedures: permits to work, lock-out and isolation, OEM checklists, document control and reporting in your format.
Team leader, vehicles, calibrated tooling and PPE
Use cases
Campaigns we have already closed as a task force
Every example is real work carried out by our team between 2015 and 2023, with the wind farm and the platform of each one. Full details in projects.
Task force in construction and warranty
Reinforcement crew for the OEM during construction and warranty: component inspection, punch list, cabling and lifelines.
Punch list and turbine handover
Closing open items turbine by turbine and handing over turbines to the client with complete documentation.
Turbine cabling
Pulling and terminating tower and nacelle cabling during installation campaigns, with electrical technicians.
Retrofits and torque checks
Fleet-wide retrofits to the OEM's technical note (TN) or anti-static retrofits, torque checks and generator alignment.
Lifelines and service lifts
Certification of lifelines and anchor points, installation and certification of tower service lifts, inspection of descent and rescue equipment.
Vertical cleaning
Rope-access cleaning of towers, tower sections and blades, with logo installation, before acceptance or as part of maintenance.
Installation completion and preservation
Mechanical and electrical completion after erection, and preservation of idle turbines awaiting commissioning.
Site manager and quality inspector
Site management on the client's behalf and installation quality control, with prototype follow-up in the factory and on site.
Coverage
Two mobilisation bases: Cidones (Soria, Spain) and Providencia (Santiago de Chile)
Greenwork Technology S.L.U. covers Europe and North Africa from Soria; Greenwork Technology SpA, our Chilean subsidiary, covers Latin America from Santiago. Lead times below are indicative: the firm lead time goes in the proposal and depends on scope, site-access documentation and logistics.
| Region | Mobilisation base | Indicative lead time | Where we have worked |
|---|---|---|---|
| Spain and Portugal | Cidones (Soria) | 2-5 working days | Las Viñas (G97), Nordex factory and the ports of Santander and Lumbier (Delta 4000), Martifer factory, Barão São João (MM92) |
| Chile | Santiago de Chile | 2-5 working days | Atacama, Cabo Leones, Llanos del Viento, Haru Oni, Mesamávida, Los Olmos, Alena, Renaico 2, Tchama, Calama, La Estrella, Puerto Lirquén, La Cabaña |
| Argentina, Peru and Uruguay | Santiago de Chile | 5-10 working days, subject to permits and logistics | Arauco 2, Pampa Energía II and III, La Castellana, García del Río and Vientos del Secano, Punta Lomitas, Duna Huambos, Julieta, Rosario, Libertad and Tops |
| Rest of Latin America and the Caribbean | Santiago de Chile or Cidones | 7-10 working days, subject to permits and logistics | Costa Rica (Altamira, Campos Azules, Vientos de la Perla, Vientos de Miramar), Dominican Republic (Agua Clara, Guanillo, Larimar, Juancho, Los Cocos), Guadeloupe (Sainte-Rose), Mexico (Oaxaca) |
| France and Morocco | Cidones (Soria) | 5-10 working days | Les Nouvion (N149), La Bouleste (G5X), Akhfenir (ECO 80) |
| Factories and ports outside Europe | Per project | Lead time in the proposal | Tianjin factory, China (G145, quality control and prototype follow-up) |
Profiles
The profiles that make up a task force and their training
Each campaign combines the profiles it needs: from a crew of GWO technicians with a team leader to a site manager or quality inspector working on the client's behalf.
| Profile | Training and qualification | Typical task-force duties | References |
|---|---|---|---|
| GWO wind technician | GWO Basic Safety Training (working at heights, first aid, manual handling, fire awareness) and platform-specific training | Punch list, TN retrofits, torque checks, preservation, turbine handover, rescue equipment inspection | Atacama, Alena, Los Olmos, Mesamávida |
| Electrical technician | GWO training and the electrical qualification required by the regulations of each country | Turbine cabling, electrical completion, generator alignment, anti-static retrofit | Llanos del Viento, Tchama, Los Olmos, Polche Sur |
| Rope-access and blade technician | GWO plus rope-access and blade-repair qualification | Vertical cleaning of towers, tower sections and blades; blade repair; hub and nacelle fibre; logos | Atacama, Renaico 2, Cabo Leones, San Pedro, Larimar |
| Team leader | GWO, occupational health and safety training and experience on the platform | Crew coordination, liaison with the client's manager, daily report, document control | Every campaign |
| Site manager | Experience on wind construction sites, contractor management, HSE and document control | Site management on the client's behalf, planning, milestone tracking and construction contract follow-up | Punta Lomitas, Tchama, Calama, La Estrella |
| Quality inspector | Installation and component quality control, OEM protocols | Component inspection in factory, port and on site; prototype follow-up; installation supervision; punch list | Tianjin factory, Cabo Leones, Duna Huambos, Costa Rica |
| UAS pilot | Drone operator and official Yuneec distributor, with GWO training; flights authorised under the aviation regulations of each country | Drone inspection of blades and towers, report within one week with classified damage | Drone inspection |
Training and qualifications are documented before mobilisation, in whichever contractor-coordination format your organisation uses. More in company and safety and quality (Spanish).
Safety and integration
We work to your rules, within our management system
An external crew only adds value if it enters the site without friction: complete documentation before day one, the client's induction, the OEM's permits to work and lock-out procedures, and reporting your manager can use directly.
- Integrated management system for quality, safety and the environment, with an integrated policy and our own procedures for work at height, rescue and lock-out.
- HSE and contractor coordination: the client's coordination platform, task risk assessments, permits to work and site induction.
- Document control: OEM checklists, photographic record, punch-list and turbine-handover certificates.
- Reporting: daily report from the team leader, progress per turbine and documentary close-out of the campaign.
Full PPE and inspected rescue kits on every campaign
How we work
From a campaign on paper to a crew working on site
Mobilising a crew is not about finding technicians: it is about having them trained, documented and on site with their own tools on the day they are needed. Most of the delay in a campaign is lost in paperwork, not in the work itself.
Scope
Technology, number of turbines, type of work — preventive rounds, retrofits, punch list, cabling, rope access —, location and dates. That sets the size of the crew and the profile of each technician.
Documentation
Health and safety, contractor vetting, medical checks, valid GWO training and insurance. Cleared before a single flight is booked: this is where most mobilisations get stuck.
Logistics
Flights, visas, accommodation, vehicles, calibrated tools and PPE. The crew arrives with its own kit and does not depend on the site lending it anything.
Integration
The crew works inside your organisation, the ISP’s or the OEM’s, to your procedures and your daily report, with a team leader as the single point of contact.
Handover
Work sheet per turbine and per day, punch list of whatever is still open, and documentary close-out of the campaign.
Projects
Wind farms where our crews have reinforced the client's organisation
A selection of campaigns in which our team joined the OEM's, the EPC contractor's or the owner's organisation. Case pages open in Spanish.
Frequently asked questions